HRV Commissioning

Heat Recovery Ventilation Commissioning

After heat recovery ventilation is installed then balancing and commissioning the system is vital. Ensuring that the correct designed flow rates to each vent is achieved. The following is carried out on a commissioning of an HRV system
  • Inspection of HRV unit installation and associated ducting
  • Inception of insulation where required
  • Inspection of condensate drain
  • Calculation of deigned flow rates if not carried out by installer
  • 1st measurement of flow rates (low rate) and results recorded
  • Adjustment of each vent where required
  • Further adjustments of fan speeds and vents until low speed and boost speed design flow rates are achieved
  • Client demonstration and advice on cleaning, changing filters
If you would like to discuss having your HRV system commissioned then please contact me today